|
|
|
UER Store
|
|
order your copy of Access All Areas today!
|
|
|
|
Activity
|
|
878 online
Server Time:
2024-05-02 02:47:39
|
|
|
All kinds of flip-switches...mmmm...MORE POW-POW-POW-POWER
|
|
|
Posted by The Bean |
7/3/2005 11:18 AM | remove |
I think I should be scared of that panel on the left.
|
|
Posted by THWN2 |
9/25/2005 4:45 PM | remove |
That panel on the left as you can see just above the bottom breaker on the right the buss tab is melted . This is what happens when you use ALUMINUM buss panels they are crap, Ive pulled dozens of them out and replaced them with copper bussed panels.
|
|
Posted by The Bean |
10/12/2005 9:49 AM | remove |
I'd have ripped that POS out during the remodel myself, but it looks like it would have been a nightmare to re-wire - nothing labelled, inconsistent wire colors, etc.
|
|
Posted by nostra-YOUPPI! |
1/27/2006 1:32 PM | remove |
like every restaurant on the face of the earth, i worked in a place that had been a canadian tire, a supermarket and finally a bar, its electrical panels were all labeled, for previous businesses :S
|
|
Posted by blaistom77 |
9/29/2009 7:37 PM | remove |
Looks like it phase C Thats bad ...they are 3 Phase panels
|
If you'd like to add a comment, please login or register.
|
|
|
|
All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site:
UER CONTACT
View Terms of Service |
View Privacy Policy |
Server colocation provided by Beanfield
This page was generated for you in 140 milliseconds. Since June 23, 2002, a total of 740135162 pages have been generated.
|
|