Posted by ZenCanadian It is still accessible...you just need to know the way...however, on my last scout I can say they now have work crews during the day, and they do drive around in pick up trucks.
|
Last year at Doors Open, I was talking to one of the technologists at the Portlands Energy Centre. The switchyard behind the Hearn is still running on (almost) original equipment (heavy oil-based). I'd guess the work crews are there to replace the switchgear with gas-based breakers. Shouldn't take more than a few months, I'd guess.
They'd probably finish by about June, since PEC is a peak generation plant, and they'd definitely want to have it operational for the summer months.